Earthmill are proud to be covering the supply and installation of the world’s first X-29 225kW wind turbine. Our installation team have been doing a grand job in wet conditions and you can see some of the action in the photos below!
- Preparing the nacelle
- Affixing the nacelle
- Preparing to attach the blades to the nacelle
- Affixing the blades
- Torquing the blades








